US$ 1599.50
only five months after the design was initiated
When the N&W ceased their mainline steam operations in 1959
Bachmann 51101 HO Scale 4-4-0 American 4-4-0 Steam Locomotive UP
Ready Made Trains (RMT) 99417 O Gauge Seated BEEPeople® Figures
Rapido 50217 HO Scale EMD SD9 Diesel Baltimore & Ohio B&O 771 Construction Equip. only five months after theRapido 50217 HO Scale EMD SD9 Diesel Baltimore & Ohio B&O 771 The SD7 was General Motors Electro Motive Divisions first foray into 6 axle power. The SD stood for Special Duty, while the 7 was carried over for the 4 axle GP7 series. This new series of locomotives provided extra tractive effort spread and weight distribution across the six axle trucks. Production lasted from May of 1951 to November of 1953. A total of 188 units were built for 17
US$ 1599.50
US$ 1999.50
US$ 1399.50
US$ 41.09
US$ 999.50
US$ 1999.50
US$ 1999.50
US$ 133.00
US$ 4999.50
US$ 749.50
US$ 1224.50
US$ 49.46
US$ 112.95